JOGMAI CASCADE HYDROELECTRIC PROJECT (5.2 MW)
Developed By

Project Brief
Jogmai Cascade HEP is a cascade RoR type of scheme located just d/s of Jogmai khola small Hydroelectric Project-7.6 MW in Maijogmai rural municipality-3, Illam district of Nepal. The entire project component lies on right bank of Jogmai Khola within Maijogmai Rural Municipality.
SEL has obtained survey license for Jogmai Cascade Hydropower Project in 2014 A.D. The feasibility study on the project was completed in 2018 A.D. Likewise; the initial Environmental Examination (IEE) Report on the project has been prepared. Power Purchase Agreement (PPA) concluded with Nepal Electricity Authority (NEA) on 2075/5/7 with installed capacity of 6 MW but its amendment letter has been received in 2075/01/27 for revised installed capacity of 5.2 MW. Further, Generation License was issued on 2076/10/01 signed Loan Agreement with NB Bank Limited, which is merged with Nabil bank.
Salient Features
• Installed Capacity-5.2 MW
• Project Location –Mai Jogmai Municipality of Ilam in the Eastern Development region Province-1
• Type of Scheme: Run-of-River (RoR)
• Gross Head: 127.33m
• Net Rated Head: 115.12 m
• Design Discharge: 5.26m3/sec at Q40%
• Net Annual Energy: 29.89 GWh
• Power Evacuation to: Godak 132/33kV Substation
Progress Updates
Project is going on.